Brady
New Seabury, MA

This project was completed in June of 2006 and it was a project that presented unique challenges. The first challenge was access as we only had about 10 feet of space on each side of the home to set up ladders or staging. Additionally, the ten feet we had was sloped and had a couple of stairs and some fencing incorporated with it. The second challenge we faced was localized paint failures. This was occurring due to the homes close proximity to the salt water.

The challenge of access was addressed by utilizing various staging techniques that our crews have been trained to use in situation such as these. It allowed the crew to safely access all areas of the house. We addressed the areas of localized paint failure by completing a thorough preparation of the house, which included using a very high quality primer and topcoat.

Project Statistics :
  • The customer needed us to have the project completed by June 20th and we were able to have everything completed for them by the 19th - one day ahead of schedule.


 
Home     About Us     Services     Success Stories     Project Blog     Contact Us     Sitemap

©2007 All Rights Reserved.